Unavailability

Download CSV file with data

Message-ID Rev. Start End Type of Measure Status Degree of Limitation Update Date
Gridpoint GASCADE
Injection Rate Withdrawal Rate
6124896953864006161 3 05/04/2016 06:00 15/04/2016 06:00 planned Confirmed 14.365.000 22.100.000 26/04/2016 11:07
Maintenance
6124896953864006161 2 05/04/2016 06:00 15/04/2016 06:00 planned Confirmed 14.365.000 22.100.000 15/04/2016 09:42
Maintenance
6124896953864006161 1 05/04/2016 06:00 15/04/2016 06:00 planned Confirmed 22.100.000 14.365.000 15/04/2016 09:57
Maintenance
6124896953929942793 2 18/04/2016 06:00 23/04/2016 06:00 planned Confirmed 2.762.500 11.050.000 26/04/2016 11:08
Maintenance
6124896953929942793 1 18/04/2016 06:00 23/04/2016 06:00 planned Expected 2.762.500 11.050.000 15/04/2016 09:57
Maintenance
6124896958598428952 3 08/06/2016 10:00 14/06/2016 14:00 unplanned Confirmed 8.840.000 0 14/06/2016 15:12
Reduction of injection rate
6124896958598428952 2 08/06/2016 10:00 01/08/2016 06:00 unplanned Expected 8.840.000 0 08/06/2016 10:51
Reduction of injection rate
6124896958598428952 1 08/06/2016 10:00 01/08/2016 06:00 unplanned Expected 8.840.000 0 08/06/2016 10:51
Reduction of injection rate
6124896962771516820 1 01/08/2016 06:00 03/08/2016 06:00 planned Confirmed 7.735.000 0 26/07/2016 17:43
Maintenace
6124896962771587051 1 03/08/2016 06:00 04/08/2016 06:00 planned Confirmed 4.420.000 0 26/07/2016 17:43
Maintenance
6124896962771653677 2 15/08/2016 09:00 15/08/2016 13:00 planned Confirmed 14.365.000 0 22/08/2016 15:12
Maintenance
6124896962771653677 1 15/08/2016 09:00 15/08/2016 13:00 planned Expected 14.365.000 0 26/07/2016 17:43
Maintenance
6124896964825814667 5 20/08/2016 06:00 01/09/2016 18:00 unplanned Confirmed 5.600.000 0 02/09/2016 08:42
technical failure
6124896964825814667 4 20/08/2016 06:00 02/09/2016 06:00 unplanned Confirmed 5.600.000 0 01/09/2016 16:36
technical failure
6124896964825814667 3 20/08/2016 06:00 02/09/2016 06:00 unplanned Expected 5.600.000 0 31/08/2016 16:09
technical failure
6124896964825814667 2 20/08/2016 06:00 27/08/2016 06:00 unplanned Expected 5.600.000 0 19/08/2016 12:19
technical failure
6124896964825814667 1 20/08/2016 06:00 27/08/2016 06:00 unplanned Expected 5.600.000 0 19/08/2016 12:19
technical faillure
6124896980562754572 2 17/02/2017 15:00 21/02/2017 06:00 unplanned Confirmed 0 6.629.380 22/02/2017 11:27
The limitation of withdrawal rate amounts to 30%.
6124896980562754572 1 17/02/2017 15:00 21/02/2017 06:00 unplanned Expected 0 6.629.380 17/02/2017 14:41
The limitation of withdrawal rate amounts to 30%.
6124896980812625602 2 21/02/2017 06:00 24/02/2017 15:00 unplanned Confirmed 0 5.462.500 24/02/2017 14:59
The limitation of withdrawal rate amounts to 25%.
6124896980812625602 1 21/02/2017 06:00 03/03/2017 06:00 unplanned Expected 0 5.462.500 20/02/2017 12:06
The limitation of withdrawal rate amounts to 25%.
6124896982464892999 2 11/03/2017 15:00 11/03/2017 18:00 unplanned Confirmed 14.324.375 22.037.500 11/03/2017 17:10
The limitation of injection- and withdrawal rate amount to 100%.
6124896982464892999 1 11/03/2017 15:00 12/03/2017 06:00 unplanned Expected 14.324.375 22.037.500 11/03/2017 15:03
The limitation of injection- and withdrawal rate amount to 100%.
6124896978664369980 2 24/04/2017 08:00 24/04/2017 14:00 planned Confirmed 14.324.375 22.037.500 20/04/2017 15:45
The limitation of injection- and withdrawal rate amount to 100%.
6124896978664369980 1 24/04/2017 08:00 24/04/2017 14:00 planned Expected 14.324.375 22.037.500 30/01/2017 09:36
The limitation of injection- and withdrawal rate amount to 100%.
6124896978728099098 2 25/04/2017 07:00 27/04/2017 17:00 planned Confirmed 2.524.370 0 20/04/2017 15:50
The limitation of injection rate amounts to 18%.
6124896978728099098 1 25/04/2017 07:00 27/04/2017 17:00 planned Expected 2.524.370 0 30/01/2017 09:36
The limitation of injection rate amounts to 18%.
6124896987210909413 3 10/05/2017 06:00 10/05/2017 14:00 planned Confirmed 5.484.375 0 22/05/2017 10:27
The limitation of injection rate amounts to 38%.
6124896987210909413 2 10/05/2017 06:00 10/05/2017 14:00 planned Expected 5.484.375 0 05/05/2017 14:49
The limitation of injection rate amounts to 38%.
6124896987210909413 1 10/05/2017 06:00 10/05/2017 14:00 planned Expected 6.630.000 0 05/05/2017 14:24
The limitation of injection rate amounts to 38%.
6124896994207654219 2 14/08/2017 06:00 19/08/2017 06:00 planned Confirmed 6.630.000 0 07/09/2017 11:19
The limitation of injection rate amounts to 46%.
6124896994207654219 1 14/08/2017 06:00 19/08/2017 06:00 planned Expected 6.630.000 0 25/07/2017 15:07
The limitation of injection rate amounts to 46%.
6124896996633373036 6 09/10/2017 06:00 01/11/2017 06:00 planned Confirmed 3.315.000 0 06/11/2017 10:57
The limitation of injection rate amounts to 23%.
6124896996633373036 5 09/10/2017 06:00 01/11/2017 06:00 planned Expected 3.315.000 0 22/08/2017 15:52
The limitation of injection rate amounts to 23%.
6124896996633373036 4 09/10/2017 06:00 01/11/2017 06:00 planned Expected 3.315.000 0 22/08/2017 15:51
The limitation of injection rate amounts to 23%.
6124896996633373036 3 09/10/2017 06:00 01/11/2017 06:00 planned Expected 3.315.000 0 22/08/2017 15:48
The limitation of injection rate amounts to 25%.
6124896996633373036 2 09/10/2017 06:00 01/11/2017 06:00 planned Expected 3.315.000 0 22/08/2017 15:47
The limitation of injection rate amounts to 23%.
6124896996633373036 1 09/10/2017 06:00 01/11/2017 06:00 planned Expected 3.315.000 0 22/08/2017 15:52
The limitation of injection- and withdrawal rate amount to 23 %.
6124896978665520764 4 13/11/2017 07:00 13/11/2017 17:00 planned Confirmed 0 0 12/09/2017 10:15
The limitation of injection- and withdrawal rate is cancelled.
6124896978665520764 3 13/11/2017 07:00 13/11/2017 17:00 planned Expected 0 0 11/09/2017 14:49
The limitation of injection- and withdrawal rate is cancelled.
6124896978665520764 2 13/11/2017 07:00 13/11/2017 17:00 planned Expected 14.365.000 22.100.000 25/07/2017 14:21
The limitation of injection- and withdrawal rate amount to 100%.
6124896978665520764 1 13/11/2017 07:00 13/11/2017 17:00 planned Expected 14.324.375 22.037.500 30/01/2017 09:36
The limitation of injection- and withdrawal rate amount to 100%.
6124896978727678403 7 20/11/2017 06:00 25/11/2017 15:00 planned Confirmed 0 22.100.000 24/11/2017 14:12
The limitation of withdrawal rate amounts to 100%.
6124896978727678403 6 20/11/2017 06:00 25/11/2017 15:00 planned Expected 0 22.100.000 22/09/2017 10:50
The limitation of withdrawal rate amounts to 100%.
6124896978727678403 5 20/11/2017 06:00 01/12/2017 06:00 planned Expected 0 22.100.000 13/09/2017 09:57
The limitation of withdrawal rate amounts to 100%.
6124896978727678403 4 20/11/2017 06:00 01/12/2017 06:00 planned Expected 0 22.100.000 13/09/2017 09:43
The limitation of injection- and withdrawal rate amount to 100%.
6124896978727678403 3 20/11/2017 06:00 01/12/2017 06:00 planned Expected 14.365.000 22.100.000 11/09/2017 14:42
The limitation of injection- and withdrawal rate amount to 100%.
6124896978727678403 2 14/11/2017 07:00 16/11/2017 17:00 planned Expected 14.365.000 22.100.000 25/07/2017 14:20
The limitation of injection- and withdrawal rate amount to 100%.
6124896978727678403 1 14/11/2017 07:00 16/11/2017 17:00 planned Expected 14.324.375 22.037.500 30/01/2017 09:36
The limitation of injection- and withdrawal rate amount to 100%.
6124897003871903989 8 20/02/2018 06:00 20/02/2018 13:00 planned Confirmed 0 22.100.000 20/02/2018 12:27
The limitation of withdrawal rate amounts to 100%.
6124897003871903989 7 20/02/2018 06:00 20/02/2018 18:00 planned Confirmed 0 22.100.000 19/02/2018 15:41
The limitation of withdrawal rate amounts to 100%.
6124897003871903989 6 20/02/2018 06:00 20/02/2018 18:00 planned Expected 0 22.100.000 14/02/2018 11:32
The limitation of withdrawal rate amounts to 100%.
6124897003871903989 5 15/02/2018 06:00 15/02/2018 18:00 planned Expected 0 22.100.000 12/02/2018 14:10
The limitation of withdrawal rate amounts to 100%.
6124897003871903989 4 15/02/2018 06:00 16/02/2018 18:00 planned Expected 0 22.100.000 12/02/2018 13:55
The limitation of withdrawal rate amounts to 100%.
6124897003871903989 3 15/02/2018 06:00 16/02/2018 18:00 planned Expected 0 22.100.000 12/02/2018 13:54
The limitation of withdrawal rate amounts to 100%.
6124897003871903989 2 13/02/2018 06:00 13/02/2018 18:00 planned Expected 0 22.100.000 23/01/2018 11:28
The limitation of withdrawal rate amounts to 100%.
6124897003871903989 1 31/01/2018 06:00 31/01/2018 18:00 planned Expected 0 22.100.000 14/11/2017 17:09
The limitation of withdrawal rate amounts to 100%.
6124897012724494537 3 24/02/2018 20:00 24/02/2018 22:00 unplanned Confirmed 14.365.000 22.100.000 26/02/2018 10:02
The limitation of injection- and withdrawal rate amount to 100%.
6124897012724494537 2 24/02/2018 20:00 24/02/2018 22:00 unplanned Expected 14.365.000 22.100.000 24/02/2018 21:56
The limitation of injection- and withdrawal rate amount to 100%.
6124897012724494537 1 24/02/2018 20:00 25/02/2018 00:00 unplanned Expected 14.365.000 22.100.000 24/02/2018 20:30
The limitation of injection- and withdrawal rate amount to 100%.
6124897012744721006 2 25/02/2018 02:00 25/02/2018 06:00 unplanned Confirmed 14.365.000 22.100.000 25/02/2018 05:54
The limitation of injection- and withdrawal rate amount to 100%.
6124897012744721006 1 25/02/2018 02:00 25/02/2018 06:00 unplanned Expected 14.365.000 22.100.000 25/02/2018 02:07
The limitation of injection- and withdrawal rate amount to 100%.
6124897013256608052 4 03/03/2018 02:00 03/03/2018 12:00 unplanned Confirmed 0 22.100.000 14/03/2018 11:14
The limitation of withdrawal rate amounts to 100%.
6124897013256608052 3 03/03/2018 02:00 03/03/2018 12:00 unplanned Expected 0 22.100.000 03/03/2018 08:49
The limitation of withdrawal rate amounts to 100%.
6124897013256608052 2 03/03/2018 02:00 03/03/2018 10:00 unplanned Expected 0 22.100.000 03/03/2018 03:59
The limitation of withdrawal rate amounts to 100%.
6124897013256608052 1 03/03/2018 02:00 03/03/2018 06:00 unplanned Expected 0 22.100.000 03/03/2018 00:19
The limitation of withdrawal rate amounts to 100%.
6124897007171215127 5 23/04/2018 06:00 27/04/2018 18:00 planned Confirmed 14.365.000 0 02/05/2018 10:00
Maintenance Injectionflow is Zero.
6124897007171215127 4 23/04/2018 06:00 27/04/2018 18:00 planned Expected 14.365.000 0 26/04/2018 12:25
Maintenance Injectionflow is Zero.
6124897007171215127 3 23/04/2018 06:00 28/04/2018 15:00 planned Expected 14.365.000 0 24/04/2018 11:06
Maintenance Injectionflow is Zero.
6124897007171215127 2 23/04/2018 06:00 29/04/2018 15:00 planned Expected 14.635.000 0 22/12/2017 13:56
Maintenance Injectionflow is Zero.
6124897007171215127 1 23/04/2018 06:00 29/04/2018 15:00 planned Expected 14.635.000 0 22/12/2017 13:57
Maintenance
6124897007171435717 3 15/10/2018 06:00 20/10/2018 12:00 planned Confirmed 14.365.000 22.100.000 19/10/2018 11:36
The limitation of injection- and withdrawal rate amount to 100%.
6124897007171435717 2 15/10/2018 06:00 20/10/2018 12:00 planned Expected 14.365.000 22.100.000 19/10/2018 11:36
The limitation of injection- and withdrawal rate amount to 100%.
6124897007171435717 1 15/10/2018 06:00 21/10/2018 15:00 planned Expected 14.365.000 22.100.000 22/12/2017 13:59
total shut down
6124897029528701845 3 20/10/2018 12:00 01/11/2018 06:00 planned Confirmed 4.420.000 0 31/10/2018 08:55
The limitation of injection rate amounts to 31%.
6124897029528701845 2 20/10/2018 12:00 01/11/2018 06:00 planned Expected 4.420.000 0 19/10/2018 11:40
The limitation of injection rate amounts to 31%.
6124897029528701845 1 21/10/2018 15:00 01/11/2018 06:00 planned Expected 4.420.000 0 07/09/2018 09:20
The limitation of injection rate amounts to 31%.
6124897044066996721 2 22/02/2019 15:00 22/02/2019 16:00 unplanned Confirmed 0 0 22/02/2019 15:47
According to latest geological assessments of the Rehden storage reservoir storage level (working gas volume) is lower than assumed. For new storage level see publication.
6124897044066996721 1 22/02/2019 15:00 22/02/2019 16:00 unplanned Confirmed 0 0 22/02/2019 15:00
Aktuellen geologischen Untersuchungen des Erdgasspeichers Rehden zufolge ist tatsächlicher Füllstand geringer als bisher angenommen. Zum neuen Füllstand siehe Veröffentlichung.
6124897050543786730 2 09/05/2019 06:00 14/05/2019 06:00 unplanned Confirmed 4.972.500 0 13/05/2019 15:06
The limitation of injection rate amounts to 35%.
6124897050543786730 1 09/05/2019 06:00 14/05/2019 06:00 unplanned Expected 4.972.500 0 08/05/2019 14:55
The limitation of injection rate amounts to 35%.
6124897050543939834 2 14/05/2019 06:00 17/05/2019 19:00 unplanned Confirmed 6.077.500 0 17/05/2019 18:36
The limitation of injection rate amounts to 42%.
6124897050543939834 1 14/05/2019 06:00 03/06/2019 06:00 unplanned Expected 6.077.500 0 08/05/2019 14:55
The limitation of injection rate amounts to 42%.
6124897038522668124 3 03/06/2019 06:00 07/06/2019 17:00 planned Confirmed 14.365.000 22.100.000 06/06/2019 13:43
The limitation of injection- and withdrawal rate amount to 100%.
6124897038522668124 2 03/06/2019 06:00 08/06/2019 06:00 planned Expected 14.365.000 22.100.000 29/05/2019 16:30
The limitation of injection- and withdrawal rate amount to 100%.
6124897038522668124 1 03/06/2019 06:00 08/06/2019 06:00 planned Expected 14.365.000 0 20/12/2018 10:40
The limitation of injection rate amounts to 100%.
6124897052364203816 2 08/06/2019 06:00 21/06/2019 06:00 planned Confirmed 0 15.470.000 07/06/2019 08:55
The limitation of withdrawal rate amounts to 70%.
6124897052364203816 1 08/06/2019 06:00 21/06/2019 06:00 planned Expected 0 15.470.000 03/06/2019 09:13
The limitation of withdrawal rate amounts to 70%.
6124897052364273374 2 21/06/2019 06:00 01/07/2019 06:00 planned Confirmed 0 1.105.000 02/07/2019 11:45
The limitation of withdrawal rate amounts to 5%.
6124897052364273374 1 21/06/2019 06:00 01/07/2019 06:00 planned Expected 0 1.105.000 03/06/2019 09:13
The limitation of withdrawal rate amounts to 5%.
6124897051912978583 3 08/07/2019 06:00 26/07/2019 18:00 planned Confirmed 6.077.500 0 29/07/2019 11:14
Limitation injection capacity
6124897051912978583 2 08/07/2019 06:00 26/07/2019 18:00 planned Expected 6.077.500 0 09/07/2019 17:07
Limitation injection capacity
6124897051912978583 1 08/07/2019 06:00 26/07/2019 18:00 planned Expected 6.077.500 0 24/05/2019 11:12
Limitation injection capacity
6124897058512968963 1 09/08/2019 06:00 09/08/2019 07:00 unplanned Confirmed 0 0 09/08/2019 05:59
According to latest geological assessments of the Rehden storage reservoir the working gas volume is lower than assumed. For new working gas volume see GIE publication.
6124897058574590218 2 09/08/2019 14:00 01/09/2019 06:00 unplanned Confirmed 0 15.470.000 10/10/2019 15:15
The limitation of withdrawal rate amounts to 70%.
6124897058574590218 1 09/08/2019 14:00 01/09/2019 06:00 unplanned Expected 0 15.470.000 09/08/2019 13:43
The limitation of withdrawal rate amounts to 70%.
6124897055972696728 3 01/09/2019 06:00 30/09/2019 18:00 planned Confirmed 0 4.420.000 10/10/2019 15:16
The limitation of withdrawal rate amounts to 20%.
6124897055972696728 2 01/09/2019 06:00 30/09/2019 18:00 planned Expected 0 4.420.000 09/08/2019 13:37
The limitation of withdrawal rate amounts to 20%.
6124897055972696728 1 29/08/2019 06:00 30/09/2019 18:00 planned Expected 0 4.420.000 12/07/2019 11:43
The limitation of withdrawal rate amounts to 20%.
6124897038526897702 2 07/10/2019 06:00 12/10/2019 18:00 planned Confirmed 14.365.000 22.100.000 12/10/2019 00:08
The limitation of injection- and withdrawal rate amount to 100%.
6124897038526897702 1 07/10/2019 06:00 14/10/2019 06:00 planned Expected 14.365.000 22.100.000 20/12/2018 11:51
The limitation of injection- and withdrawal rate amount to 100%.
6124897064126624225 2 12/10/2019 20:00 13/10/2019 12:00 unplanned Confirmed 14.365.000 22.100.000 14/10/2019 08:40
The limitation of injection- and withdrawal rate amount to 100%.
6124897064126624225 1 12/10/2019 20:00 13/10/2019 12:00 unplanned Expected 14.365.000 22.100.000 12/10/2019 19:54
The limitation of injection- and withdrawal rate amount to 100%.
6124897071719069876 2 05/10/2020 06:00 17/10/2020 18:00 planned Confirmed 14.365.000 22.100.000 19/10/2020 09:12
The limitation of injection- and withdrawal rate amount to 100%.
6124897071719069876 1 05/10/2020 06:00 17/10/2020 18:00 planned Expected 14.365.000 22.100.000 13/01/2020 16:03
The limitation of injection- and withdrawal rate amount to 100%.
6124897077225460981 3 02/11/2020 08:00 02/11/2020 10:00 planned Confirmed 14.365.000 0 02/11/2020 09:29
The limitation of injection rate amounts to 100%.
6124897077225460981 2 02/11/2020 08:00 11/12/2020 18:00 planned Expected 14.365.000 0 13/03/2020 09:58
The limitation of injection rate amounts to 100%.
6124897077225460981 1 02/11/2020 08:00 11/12/2020 18:00 planned Expected 14.365.000 0 13/03/2020 09:58
The limitation of injection rate amounts to 100%.
6124897097529895871 4 05/11/2020 08:00 23/11/2020 08:00 planned Confirmed 6.630.000 0 24/11/2020 14:05
The limitation of injection rate amounts to 46%.
6124897097529895871 3 05/11/2020 08:00 23/11/2020 08:00 planned Expected 6.630.000 0 18/11/2020 16:00
The limitation of injection rate amounts to 46%.
6124897097529895871 2 05/11/2020 08:00 11/12/2020 18:00 planned Expected 6.630.000 0 04/11/2020 16:29
The limitation of injection rate amounts to 46%.
6124897097529895871 1 05/11/2020 08:00 11/12/2020 18:00 planned Expected 0 0 02/11/2020 09:33
The limitation of injection- and withdrawal rate amount to 100%.
6124897096668162710 3 23/11/2020 08:00 22/12/2020 14:00 planned Confirmed 7.182.500 0 22/12/2020 13:35
The limitation of injection rate amounts to 50%.
6124897096668162710 2 23/11/2020 08:00 04/01/2021 17:00 planned Expected 7.182.500 0 18/11/2020 16:02
The limitation of injection rate amounts to 50%.
6124897096668162710 1 11/12/2020 18:00 04/01/2021 17:00 planned Expected 4.420.000 0 23/10/2020 14:20
The limitation of injection rate amounts to 31%.
6124897091146785176 5 04/10/2021 06:00 16/10/2021 18:00 planned Confirmed 14.365.000 22.100.000 16/10/2021 16:58
The limitation of injection- and withdrawal rate amount to 100%.
6124897091146785176 4 04/10/2021 06:00 16/10/2021 18:00 planned Expected 14.365.000 22.100.000 01/10/2021 10:21
The limitation of injection- and withdrawal rate amount to 100%.
6124897091146785176 3 04/10/2021 06:00 16/10/2021 18:00 planned Expected 14.365.000 22.100.000 26/08/2021 09:13
The limitation of injection- and withdrawal rate amount to 100%.
6124897091146785176 2 04/10/2021 06:00 16/10/2021 18:00 planned Expected 14.365.000 22.100.000 23/06/2021 16:56
The limitation of injection- and withdrawal rate amount to 100%.
6124897091146785176 1 04/10/2021 06:00 15/10/2021 18:00 planned Expected 14.365.000 22.100.000 26/08/2020 10:51
The limitation of injection- and withdrawal rate amount to 100%.
6124897127187973640 3 12/10/2021 06:00 05/12/2022 06:00 unplanned Confirmed 0 0 05/12/2022 10:45
Working gas level-dependent restriction of withdrawal capacities at UGS Rehden. Further details can be found in the adapted storage specification shortly.
6124897127187973640 2 12/10/2021 06:00 31/12/2099 06:00 unplanned Confirmed 0 0 05/04/2022 17:11
Working gas level-dependent restriction of withdrawal capacities at UGS Rehden. Further details can be found in the adapted storage specification shortly.
6124897127187973640 1 12/10/2021 06:00 31/12/2099 06:00 unplanned Confirmed 0 0 11/10/2021 16:55
Working gas level-dependent restriction of withdrawal capacities at UGS Rehden. Further details can be found in the adapted storage specification shortly.
6124897145919430444 3 07/06/2022 06:00 10/06/2022 06:00 planned Confirmed 0 1.326.000 09/06/2022 09:06
Reduction of Exit Capacity
6124897145919430444 2 07/06/2022 06:00 10/06/2022 06:00 planned Expected 0 1.326.000 08/06/2022 16:11
Reduction of Exit Capacity
6124897145919430444 1 07/06/2022 06:00 24/06/2022 17:00 planned Expected 0 1.326.000 16/05/2022 12:06
Reduction of Exit Capacity
6124897147921502506 2 10/06/2022 06:00 20/06/2022 06:00 planned Confirmed 0 22.100.000 21/06/2022 08:49
The limitation of withdrawal rate amounts to 100%.
6124897147921502506 1 10/06/2022 06:00 20/06/2022 06:00 planned Expected 0 22.100.000 08/06/2022 16:21
The limitation of withdrawal rate amounts to 100%.
6124897147921652559 2 20/06/2022 06:00 24/06/2022 17:00 planned Confirmed 0 1.326.000 01/07/2022 09:56
Limitation of withdrawal rate.
6124897147921652559 1 20/06/2022 06:00 24/06/2022 17:00 planned Expected 0 1.326.000 08/06/2022 16:21
Limitation of withdrawal rate.
6124897147921804625 2 29/06/2022 06:00 05/07/2022 17:00 planned Confirmed 0 22.100.000 07/07/2022 09:20
The limitation of withdrawal rate amounts to 100%.
6124897147921804625 1 29/06/2022 06:00 05/07/2022 17:00 planned Expected 0 22.100.000 08/06/2022 16:21
The limitation of withdrawal rate amounts to 100%.
6124897147921919144 3 05/09/2022 12:00 12/09/2022 06:00 planned Confirmed 0 22.100.000 19/09/2022 13:31
The limitation of withdrawal rate amounts to 100%.
6124897147921919144 2 05/09/2022 12:00 12/09/2022 06:00 planned Expected 0 22.100.000 01/09/2022 16:05
The limitation of withdrawal rate amounts to 100%.
6124897147921919144 1 08/09/2022 06:00 12/09/2022 06:00 planned Expected 0 22.100.000 08/06/2022 16:21
The limitation of withdrawal rate amounts to 100%.
6124897126302002140 5 12/09/2022 06:00 24/09/2022 18:00 planned Confirmed 14.365.000 22.100.000 26/09/2022 16:34
The limitation of injection- and withdrawal rate amount to 100%.
6124897126302002140 4 12/09/2022 06:00 24/09/2022 18:00 planned Expected 14.365.000 22.100.000 13/09/2022 10:37
The limitation of injection- and withdrawal rate amount to 100%.
6124897126302002140 3 12/09/2022 06:00 24/09/2022 06:00 planned Expected 14.365.000 22.100.000 26/07/2022 18:12
The limitation of injection- and withdrawal rate amount to 100%.
6124897126302002140 2 12/09/2022 06:00 24/09/2022 18:00 planned Expected 14.365.000 22.100.000 01/10/2021 10:49
The limitation of injection- and withdrawal rate amount to 100%.
6124897126302002140 1 12/09/2022 06:00 24/09/2022 18:00 planned Expected 14.365.000 22.100.000 01/10/2021 10:53
The limitation of injection- and withdrawal rate amount to 100%.
6124897165381325635 4 09/01/2023 06:00 12/01/2023 18:00 planned Confirmed 14.365.000 0 16/01/2023 15:27
The limitation of injection rate amounts to 100%.
6124897165381325635 3 09/01/2023 06:00 12/01/2023 18:00 planned Expected 14.365.000 0 10/01/2023 16:55
The limitation of injection rate amounts to 100%.
6124897165381325635 2 09/01/2023 06:00 12/01/2023 18:00 planned Expected 14.950.000 0 10/01/2023 16:23
The limitation of injection rate amounts to 100%.
6124897165381325635 1 09/01/2023 06:00 12/01/2023 18:00 planned Expected 14.365.000 0 27/12/2022 17:10
The limitation of injection rate amounts to 100%.
6124897168382012601 3 31/01/2023 10:00 03/02/2023 06:00 unplanned Confirmed 14.365.000 22.100.000 02/02/2023 14:31
The limitation of injection- and withdrawal rate amount to 100%.
6124897168382012601 2 31/01/2023 10:00 03/02/2023 06:00 unplanned Expected 14.365.000 22.100.000 02/02/2023 14:30
The limitation of injection- and withdrawal rate amount to 100%.
6124897168382012601 1 31/01/2023 10:00 03/02/2023 18:00 unplanned Expected 14.365.000 22.100.000 31/01/2023 10:43
The limitation of injection- and withdrawal rate amount to 100%.
6124897168568641940 2 03/02/2023 06:00 02/03/2023 16:00 unplanned Confirmed 14.365.000 0 02/03/2023 15:27
The limitation of injection rate amounts to 100%.
6124897168568641940 1 03/02/2023 06:00 03/03/2023 18:00 unplanned Expected 14.365.000 0 02/02/2023 14:33
The limitation of injection rate amounts to 100%.
6124897157070717441 4 01/05/2023 06:00 13/05/2023 15:00 planned Confirmed 14.690.000 22.600.000 13/05/2023 14:22
The limitation of injection- and withdrawal rate amount to 100%.
6124897157070717441 3 01/05/2023 06:00 13/05/2023 18:00 planned Expected 14.690.000 22.600.000 07/03/2023 13:51
The limitation of injection- and withdrawal rate amount to 100%.
6124897157070717441 2 01/05/2023 06:00 13/05/2023 18:00 planned Expected 14.365.000 22.100.000 24/11/2022 17:13
The limitation of injection- and withdrawal rate amount to 100%.
6124897157070717441 1 02/05/2023 06:00 13/05/2023 18:00 planned Expected 14.365.000 22.100.000 22/09/2022 13:41
The limitation of injection- and withdrawal rate amount to 100%.
6124897185245004455 3 12/11/2023 06:00 18/11/2023 13:00 planned Confirmed 14.690.000 22.600.000 18/11/2023 11:53
The limitation of injection- and withdrawal rate amounts to 100%.
6124897185245004455 2 12/11/2023 06:00 18/11/2023 13:00 planned Expected 14.690.000 22.600.000 18/11/2023 11:53
The limitation of injection- and withdrawal rate amounts to 100%.
6124897185245004455 1 12/11/2023 06:00 18/11/2023 18:00 planned Expected 14.690.000 22.600.000 14/08/2023 15:59
The limitation of injection- and withdrawal rate amounts to 100%.
6124897185245419810 3 18/11/2023 13:00 24/11/2023 15:00 planned Confirmed 14.690.000 1.130.000 24/11/2023 14:06
The limitation of the injection rate amounts to 100%. The limitation of the withdrawal rate amounts to 5%.
6124897185245419810 2 18/11/2023 13:00 24/11/2023 18:00 planned Expected 14.690.000 1.130.000 18/11/2023 11:53
The limitation of the injection rate amounts to 100%. The limitation of the withdrawal rate amounts to 5%.
6124897185245419810 1 18/11/2023 18:00 24/11/2023 18:00 planned Expected 14.690.000 1.130.000 14/08/2023 15:59
The limitation of the injection rate amounts to 100%. The limitation of the withdrawal rate amounts to 5%.
6124897193362001358 4 27/11/2023 21:00 28/11/2023 12:00 planned Confirmed 0 0 28/11/2023 11:44
The astora contract processing system will not be available from 27 November 2023 21:00 to 28 November 2023 14:00. No nominations or renominations can be accepted during this time. The physical gas flow is guaranteed.
6124897193362001358 3 27/11/2023 21:00 28/11/2023 14:00 planned Expected 0 0 17/11/2023 13:10
The astora contract processing system will not be available from 27 November 2023 21:00 to 28 November 2023 14:00. No nominations or renominations can be accepted during this time. The physical gas flow is guaranteed.
6124897193362001358 2 27/11/2023 21:00 28/11/2023 14:00 planned Expected 0 0 17/11/2023 13:09
The astora contract processing system will not be available from 27 November 2023 21:00 to 28 November 2023 14:00. No nominations or renominations can be accepted during this time. The physical gas flow is guaranteed.
6124897193362001358 1 27/11/2023 21:00 28/11/2023 14:00 planned Expected 0 0 16/11/2023 13:35
The astora contract processing system will not be available from 27 November 2023 21:00 to 28 November 2023 14:00. No nominations or renominations can be accepted during this time. The physical gas flow is guaranteed.
6124897201919834511 4 14/05/2024 06:00 16/05/2024 18:00 planned Confirmed 14.692.578 22.603.726 16/05/2024 14:53
The limitation of injection- and withdrawal rate amount to 100%.
6124897201919834511 3 14/05/2024 06:00 16/05/2024 18:00 planned Expected 14.692.578 22.603.726 06/03/2024 10:44
The limitation of injection- and withdrawal rate amount to 100%.
6124897201919834511 2 14/05/2024 06:00 16/05/2024 18:00 planned Expected 14.692.578 22.604.086 03/03/2024 22:28
The limitation of injection- and withdrawal rate amount to 100%.
6124897201919834511 1 14/05/2024 06:00 16/05/2024 18:00 planned Expected 14.690.000 22.600.000 24/02/2024 12:23
The limitation of injection- and withdrawal rate amount to 100%.
6124897213152068608 3 02/07/2024 18:00 12/07/2024 12:00 unplanned Confirmed 6.215.000 0 12/07/2024 11:03
The limitation of injection rate amounts to 42%.
6124897213152068608 2 02/07/2024 18:00 12/07/2024 16:00 unplanned Expected 6.215.000 0 02/07/2024 15:57
The limitation of injection rate amounts to 42%.
6124897213152068608 1 02/07/2024 18:00 12/07/2024 16:00 unplanned Expected 6.215.000 0 02/07/2024 15:50
The limitation of withdrawal rate amounts to 42%.
6124897178917439509 6 14/10/2024 06:00 26/10/2024 11:00 planned Confirmed 14.692.578 22.603.726 26/10/2024 10:29
The limitation of injection- and withdrawal rate amounts to 100%.
6124897178917439509 5 14/10/2024 06:00 26/10/2024 18:00 planned Confirmed 14.692.578 22.603.726 26/10/2024 10:27
The limitation of injection- and withdrawal rate amounts to 100%.
6124897178917439509 4 14/10/2024 06:00 26/10/2024 18:00 planned Expected 14.692.578 22.603.726 06/03/2024 10:44
The limitation of injection- and withdrawal rate amounts to 100%.
6124897178917439509 3 14/10/2024 06:00 26/10/2024 18:00 planned Expected 14.692.578 22.604.086 03/03/2024 22:29
The limitation of injection- and withdrawal rate amounts to 100%.
6124897178917439509 2 14/10/2024 06:00 26/10/2024 18:00 planned Expected 14.690.000 22.600.000 24/02/2024 12:21
The limitation of injection- and withdrawal rate amounts to 100%.
6124897178917439509 1 14/10/2024 06:00 26/10/2024 18:00 planned Expected 14.495.000 22.300.000 02/06/2023 10:12
The limitation of injection- and withdrawal rate amounts to 100%.